Release Notes August 27, 2008 - 21:20 WGST

0.8.0 2007-12-13
  • Added Crew page to so the crew.

0.7.0 2007-06-13
  • Converted most of the page display times to %B %d, %Y - %H:%M %Z format
  • Added Vecopolar-greenland-planning maillist link
  • Added Vecopolar-summit-awo and -lrp maillists link
  • Dropped Vecopolar-summit-research maillist link; this was taken over by the SCO
  • Dropped the Calendar link for now as we are moving away from Trubma

0.6.0 2007-04-12
  • Replaced Robin with Jason as logistics coordinator
  • Added SCO email in contacts

0.5.0 2007-02-01
  • Renamed Tour section to Site, and added Summit Layout
  • Added Flight schedule to navigation bar

0.4.1 2006-02-13
  • Power Status: Only seven of the ten meters were displayed, and the time of their last update was not present.

0.4.0 2006-02-08
  • Home: Reorganized navigation links
  • Home:Projects: added page with links to research
  • Home:Files: added page with links to ftp and common folder. The common folder is password protected.
  • Home:Protocols: added link to protocols
  • Home:Protocols: added links to mailing lists

0.3.0 2006-02-03
  • Calendar : Linked both weekly and monthly calendars.
  • Home: Reworded ΒΆ1, sentence 1.
  • Home: Inserted second paragraph about IPY.
  • Contacts: Added John's phone number
  • Contacts: Changed Sandy's title
  • Contacts: Encoded email address to limit spamming
  • Tour: Revised text on opening page to note changes in building layout.
  • Status: Added weather and network sections

0.2.0 2006-01-25
  • Updated home page with new introductory text and links to VECO and the SCO.
  • Added Information:Tour
  • Added Information:Help
  • Added Information:Calendar
  • Added Resources:Contacts
  • Added Updates:Release Notes

0.1.0 2005-12-09
Initial. Basic layout with power status